FM Global

Working in conjunction with Carr Design this 1,400sqm fit out was completed in a 10 week period. The high end fit out is characterised by the large volume of built environment catering for the demand of enclosed office space and consists of a high end front of house reception and boardroom area with state of the art audio visual equipment, large staff breakout and multi- functional training spaces.

Project Details

  • Address: 600 Bourke Street
  • Area (sqm): 1,400
  • Value: $2.10m
  • Duration (weeks): 10
  • Engagement: Construction Management
  • Project Manager: Grant Hobson Consulting
  • Architect: Carr Design

Working in conjunction with Carr Design this 1,400sqm fit out was completed in a 10 week period. The high end fit out is characterised by the large volume of built environment catering for the demand of enclosed office space and consists of a high end front of house reception and boardroom area with state of the art audio visual equipment, large staff breakout and multi- functional training spaces.

Project Details

  • Address: 600 Bourke Street
  • Area (sqm): 1,400
  • Value: $2.10m
  • Duration (weeks): 10
  • Engagement: Construction Management
  • Project Manager: Grant Hobson Consulting
  • Architect: Carr Design