• Location

    130 Lonsdale Street
  • Area

    1,000sqm
  • Value

    $2.7M
  • Duration

    10 weeks
  • Engagement

    Fixed Lump Sum
  • Collaborators

    CBRE, Gray Puksand, Compass Engineering

Overview
  • Fast track delivery
  • Value management
  • High end design
  • Design workshopping


Following the successful completion of spec fit outs in the new Charter Hall development (Wesley Place), Capabuild were engaged to deliver Charter Hall’s high-end office fit out.

Largely open plan, with central curved meeting and collaborative spaces, this high end fit out incorporates an array of feature ceilings and intricate joinery items. Key to the success of the feature ceilings, was the coordination between the services subcontractors, done both on site and in weekly coordination sessions.

With a raised floor installed as part of the base building design, many height adjustments were required to accommodate the range of feature floor finishes throughout. Completing these works early in the construction sequence proved invaluable minimising the time the floor void was open and reducing the OH&S risk.

The team were able to draw on their experience from working in the building and leverage the relationship with the Consultant team to ensure the seamless delivery of this project.